Z1153 1024x683 |
The E & Z. 1024x683 |
E30 1024x683 |
The new points and track 1024x683 |
Stewart & the E, the Z with Sam followed by the G. 1024x647 |
The new points are installed for the second by pass track. 1024x683 |
Sam & David with the Z on 6 September 2009. 1024x651 |
The new track with a set stabled on it. 1024x683 |
The new container. 1024x683 |
A bit of a line up on 6 September 2009. 1024x683 |
The station 6 September 2009. 1024x676 |
New points and track. 1024x683 |
Sam & the Z & E. 1024x683 |
Rob passes the recently roofed station & Verandah on 4 October 2009. 1024x683 |
The station with roof in place on 4 October 2009. 1024x683 |
Allan, Matilda and the station on 4 October 2009. 1024x683 |
Station scene 4 October 2009. 1024x683 |
Jim & the diesel passing the station on 4 October 2009. 1024x677 |
Concrete pour on the new bypass track. 1024x683 |
Welding the track connections on the by pass line. 1024x683 |
Concrete pour on the new bypass track. 1024x683 |
Concrete pour on the new bypass track. 1024x683 |
Tracklaying on the new by pass line. 1024x683 |
Concrete pour on the new bypass track. 1024x683 |
The track going down on the new by pass line 1024x683 |
track laying on the by pass line. 1024x683 |
The station now with its roof on. 1024x683 |
| | | |